Building Committee
Minutes
Tuesday October 9, 2007, 5pm Meeting #11 in Parish
House
Conference Room
Present: Building Committee
members Fr. Bajorek, John Bowie, Tom Felton, Ernie Menold, Jack Quindlen, John
Brennan and Ken Margolis along with invited guests, Rosemary Endres, Mike
Keller and Charlie Thomas.
v
Fr. Bajorek opened the
meeting with a prayer.
v
Minutes from the September
19th meeting were previously approved by email consensus.
11A. KM presented an overview
of the findings from our September 19th meeting using the mock ups
of the Blessed Sacrament Altar and Ambo. A wooden platform will be constructed
to allow positioning of the Ambo is various areas to better understand esthetics
and functionality. Discussions with Charles Flynn of Marble Works Inc. (a recommended
vendor by the Archdiocese) has confirmed that a step extension of our existing
marble or a stand alone platform to support the Ambo are both viable options,
each having specific challenges. The step extension presents risks such as color
match and the stand alone platform size needs to ensure proper clearance on all
sides for ease of movement. The Ambo platform support mock up will help us
determine a practical solution.
11B. Fr. Bajorek and those
available from the committee will visit on Thursday October 11th, St.
Joseph in Aston, Our Lady of Charity in Brookhaven and Notre Dame in Swarthmore
to evaluate their renovations with hopes to gain insight and help the SJC
planning process.
11C. Tom presented updates on
the entire project starting with the outside traffic flow improvements. Jack Q
has been the driving force for this initiative and after careful discussion, it
was concluded that the outside work will be divided into three phases that
include, #1- renovations in the front of the Church, #2- closing off an
existing entrance on Providence road and #3- constructing the parking lot near
the convent. Decisions were based upon the storm water management costs, permit
timing and engineering fees as compared to available capital campaign funds.
Jack Q will work with the civil engineer to better understand costs and implications
of each phase.
11D. Tom reviewed the design
status of the Ceiling/lighting/Sound and Elevator and reported that the submittal for preliminary approval to the Archdiocese on
October 19th; we will submit a set of documents with drawings that
are approximately 80% complete (Archdiocese requirement).
We also plan to
use these submittal drawings for pre-bidding by a selected short list of
contractors.
11E. Jack Q will arrange
asbestos testing of the ceiling tile.
11F. Tom will contact Home and School
president John Gelato and discuss with him our initial thoughts to relocate the
primary unit kitchen, CCD room and Copy room to allow for the elevator
equipment location. He will ask John to communicate with and distribute our
proposed layout drawing to high use users of these areas including the school
Principal, CCD, Pre-Cana and Hospitality committee leaders seeking their
comments and or endorsement to our proposed recommendations.
11G. We discussed the
Archdiocese approval process and our goal to receive approval in December.
Arthur Friedman is the coordinator of the approval process and he will visit
SJC on November 6th and meet with Fr. Bajorek, Tom and Ken to
discuss the process and offer his assistance to ensure we meet the
requirements.
v
Next Steps:
á
BCMÕs to complete action
items as stated above and as pending from previous meetings.
á
Tom will coordinate
individual meetings and phone conferences with BCMÕs as required to expedite
the timeline action items.
á
The Building Committee
members will meet when the Ambo platform has been prepared, date and time to be
determined.
á
ÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉ..Submitted
by KM