Building Committee
Minutes
Wednesday January 29, 2008, 4pm Meeting #14 in the
Church
Present: Building Committee
members Fr. Bajorek, Tom Felton, Jane Banik, Jack Quindlen, John Bowie, John
Brennan and Ken Margolis along with invited guests, Rosemary Endres, Mike
Keller and Betty Sprague (Church interior Designer).
v
Minutes from the January
2nd meeting were previously approved by email consensus and posted on our Web
Site.
14A. TomÕs firm prepared a
scaled model of the Church interior illustrating two ceiling design schemes. The
model was extremely helpful in depicting the design and allowed a good visual
to determine cost reduction opportunities to bring the ceiling design closer to
budget while maintaining a quality appearance consistent with the original design intent.
14B. A lengthy conversation
ensued pertaining to the ceiling design and areas that still require design
study, such as the transition from the wall marble to the lantern wall and the
possible elimination of the rear ceiling coffers with a more simple design.
14C. Jane presented
decorative light fixture samples for consideration and depending on budget; the
ceiling can be configured to accept at a later date the actual fixtures.
14D. Jack presented an update
on the traffic flow approval process and an alternative design idea was discussed.
Jack will be making a recommendation on how best to proceed.
14E. The pre-bids received
from five General Contractors on January 18th was discussed and four
are currently being considered.
14F. It was agreed that Fr.
Bajorek, building committee members (Jack and Ken) along with SJC Architect
(Tom) will meet with the four Contractors at their offices and conduct
interviews specific to the project as it relates to St. JohnÕs logistical and
budget requirements.
14G. After the interview
process is completed; the Building Committee will meet, review the findings of
the interviews and discuss the proposed timeline as recommended by TomÕs firm
with the objective to make a decision on how and when to proceed with the
planned renovations.
v
Next Steps:
á
BCMÕs to complete
action items as stated above and as pending from previous meetings.
á
The Building
Committee members will meet after the Contractor interview process has been
completed.
á
ÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉÉ..Submitted
by KM